Projects
Supply and Delivery of Office Equipment for Use in Baseport and Terminal Ports |
NOTICE TO PROCEED |
REPAIR OF CAVED-IN FILL, SLOPE PROTECTION, SEWAGE & DRAINAGE SYSTEM & INSTALLATION OF PAVING BLOCKS AT RECLAMATION AREA, PORT OF HILONGOS, LEYTE |
BAC Resolution |
PROCUREMENT OF SUPPLY, DELIVERY, REPLACEMENT AND INSTALLATION OF STATIONARY LEAD CALCIUM BATTERIES FOR THE PORT MANAGEMENT OFFICE OF CAGAYAN DE ORO |
NOTICE OF AWARD |
REPAIR OF SCATTERED DAMAGED CONCRETE PAVEMENT LOCATED AT THE APRON BETWEEN BERTH 6-9., SASA WHARF, DAVAO CITY Ìý |
NOTICE OF AWARD |
||||||
REPAIR OF DAMAGED/DILAPIDATED 8" X 8" STEEL NOSING & MOORING BOLLARD LOCATED AT BERTH 6-9, SASA PORT, DAVAO CITY Ìý |
NOTICE OF AWARD |
||||||
PROPOSED REPAIR OF DAMAGED/SETTLED PAVING BLOCKS AT CONTAINER YARD AREA (PHASE-1), SASA WHARF, DAVAO CITY Ìý |
NOTICE TO PROCEED |
||||||
REPAIR FOR THE MAINTENANCE OF ONE HUNDRED TWO (102) UNITS RUBBER DOCK FENDERS AT BERTHS 1-5 OF SASA PORT AREA, DAVAO CITY Ìý |
NOTICE TO PROCEED |
||||||
PROPOSED REPAIR OF DAMAGED/SETTLED PAVING BLOCKS AT CONTAINER YARD AREA (PHASE-1), SASA WHARF, DAVAO CITY Ìý |
CONTRACT |
||||||
ÌýREPAIR OF DILAPIDATED ARMOUR ROCKS, LINE DRAINAGE, CONCRETE PAVEMENT AND BACK-UP AREA, AT MATI PORT, MATI, DAVAO ORIENTAL Ìý |
REPAINTING OF RAILINGS, STREET LIGHTING POST, CURBS AND CYCLONE WIRE FENCE, PORT OF BATANGAS, BATANGAS CITY (NBL CONSTRUCTION) |
NOTICE OF AWARD |
||||||
REPAINTING OF RAILINGS, STREET LIGHTING POST, CURBS AND CYCLONE WIRE FENCE, PORT OF BATANGAS, BATANGAS CITY (NBL CONSTRUCTION) |
CONTRACT |
ÌýREPAIR OF ROCK EMBANKMENT AT MASAO PORT TERMINALÌýÌý |
BAC Resolution |
REPAIR/REPLACEMENT OF PAVING BLOCKS AT OPEN STORAGE AREA AND DRAINAGE SYSTEM, PORT OF ZAMBOANGA, ZAMBOANGA CITYÌýÌýÌý |
NOTICE OF AWARD |
REPAIR OF DRAINAGE CANAL COVER, PORT OF SURIGAOÌý |
NOTICE TO PROCEED |
||||||
REPAIR OF SETTLED BACK-UP AREA AT BERTH NOS.1, 2 & 3, PORT OF SURIGAOÌýÌý |
NOTICE TO PROCEED |
||||||
ÌýREPAIR OF DRAINAGE CANAL COVER, PORT OF SURIGAOÌý |
CONTRACT |
||||||
REPAIR OF SETTLED BACK-UP AREA AT BERTH NOS.1, 2 & 3, PORT OF SURIGAO |
CONTRACT |
||||||
ÌýREPAIR OF DRAINAGE CANAL COVER, PORT OF SURIGAO |
NOTICE OF AWARD |
||||||
REPAIR OF SETTLED BACK-UP AREA AT BERTH NOS.1, 2 & 3, PORT OF SURIGAOÌý |
NOTICE OF AWARD |
CONSULTANCY SERVICES FOR THE FORMULATION OF MASTER PLANS AND CONDUCT OF FEASIBILITY STUDY OF BANAGO PORT INCLUDING SILTATION ASSESSMENT AND STRUCTURAL STABILITY/ANALYSYS OF THE EXISTING STRUCTURE, PORT OF BANAGO, BACOLOD CITY DATED NOVEMBER 7, 2012 (BASIC TECHNOLOGY AND MANAGEMENT CORPORATION) |
NOTICE TO PROCEED |
