Procurement Request

Head Office

Supply and Delivery of 153 Units HCFC 123 Fire Extinguishers

994,500.00 Quotation

Supply and Installation of 32 sets Accessories for Port Police (Hilux) Vehicles

640,000.00 Quotation

Supply and Delivery of Flags

500,000.00 Quotation

Procurement of Training Provider/Resource Person for the Advanced Corporate Governance Training/Workshop

135,000.00 Quotation

Supply and Delivery of Eight (8) units Television Set. 43" UHD 4K Smart for PPA, PMO-Zamboanga Baseport

400,000.00 Quotation

One (1) Lot - Supply and Delivery of Six units Spine Board with spider strap, Size: 48 x 7 x 186 cm and Color Orange for PPA, PMO-Zamboanga

60,000.00 Quotation

One (1) Lot Supply and Delivery of Twenty-fice (25) units Printer, Eight (8) Units Monochrome and Seventeen (17) Units Colored with Scanner (3 in 1) for PPA, PMO Zamboanga

331,040.00 Quotation

PMO NCR North

Supply, Delivery and Installation of Three (3) Tonner Floor Mounted Split Type Air Conditioning Unit (ACU) for PPA PMO NCR North

Quotation

Reposting - Supply, Delivery and Installation of Four (4) Units Three Tonner Floor Mounted Split Type Air Conditioning Unit (ACU) Inverter Type for PPA PMO NCR North

480,000.00 Quotation

PMO Misamis Oriental / Cagayan De Oro

Lumpsum materials, labor & equipment for the Repair, Derusting and Repainting of Roof Frame at Passenger's Arrival Area Building, Port of Lipata, Surigao City

987,014.94 Quotation

PMO Batangas

Supply of Preventive Maintenance Materials for the Generator Sets of Escarceo Radar Station 3 and Tingloy Radar Station 4,PPA PMO Batangas

56,499.52 Quotation

PMO Zamboanga Del Norte

Supply of Labor, Tools, Materials, and Equipment fot the Conduct of Repair of Damaged RC Curb Along RC Pier, Port of Dapitan, Dapitan City, Zamboanga Del Norte

126,610.68 Quotation Quotation

Procurement of ECC Application for the Proposed Extension of RC Pier and alll other Future Infrastructure Projects in the Port of Sindangan

593,810.00 Quotation

Proposed Extension of RC Pier and All Other Future Infrastructure Projects in the Port of Sindangan, Sindangan, Zamboanga Del Norte

593,810.00 Quotation

Fabrication of Pedestrian Covered Walkway at East-Side of Port, Port of Dapitan, Dapitan City

997,630.20 Quotation

Fabrication of Cubicle with Table Top, Shelves, and Drawer at ESD and Rewiring of Electrical and LAN outlet at ESD, Finance, Admin and Conference Room, Port of Dapitan, Dapitan City

999,819.80 Quotation

Application of Waterproofing and Bitumen Fill Surrounding the GAD Hall and Replacement of Damaged Ceiling Boards at Finance and COA, Provision of Working Area and Additional Stainless Steel Tank for PTOB, Port of Dapitan, Dapitan City

606,957.40 Quotation

PMO Mindoro

Supply, Delivery and Installation of Nine (9) Sets, Five (5)-Tonner, Non Inverter, Air Conditioning Units (ACU)

1,286,140.00 Quotation Quotation

Procurement of Eleven (11) Units, Air Conditioning Unit (ACU), Window Type, 1HP, Inverter, PMO-Mindoro

385,000.00 Quotation Quotation

PMO Zamboanga

Supply of Labor, Materials and Equipment for the Repair and Maintenance of Roofing, Ceiling and Ceiling Eaves at GAD Facilities, Port of Zamboanga, Zamboanga City

584,463.87 Quotation